July 30 Workday
/Over the last two months, MSLS members Bill Gardei and Michael Haywood have been working on the storage yard tracks next to the sheds. The picture below was taken in late June 2016 after the two outer tracks had been repaired.
Since the weather was mild yesterday, they were able to complete work on two more tracks.
In the next few weeks, gravel will be put down and all the tracks leveled.
You will also notice that the 2x storage tracks that were closest to the trees have been removed. As the trees have grown up, the roots have pushed those tracks to high up to be used safety. The remaining tracks will be spaced out a little more to allow easier walking between each line.
There are 2 more storage tracks on the right side of these trees that will be repaired sometime after the Fall Meet.