February 16 Workday
/Bill Gardei & Michael Haywood came out to the track to rehabilitate three switches. The first two switches were removed from the area between the "High Bridge" and the "Triple Bridge" on the Upperloop. These switches have been in service for over 18 years and needed a ground up rebuild. After refurbishment was completed, the switches are now ready to be put back in service in the exact same area.
The 3rd switch that was refurbished is located at the end of Conner Siding on the lowerloop. A lot of track work has been done in that area, especially on the January 28 Workday, and this was the last thing to complete. Sometime late in 2017 or early 2018, all of Conner Siding (Pictured Below) will be refurbished with new ties and rail.