March 30 Workday
/Continuing the work from the March 21th Workday, additional track was replaced near the steaming bays that lead to the unload & loading ramp. All three switches have now been rehabilitated and the layout of the switches has been altered slightly from their original configuration. Additionally, the track next to the diesel turntable has been reinforced, just like the track in the bottom photo on the opposite site of these switches, due to high amounts of foot traffic in that area. The final siding track will be reconnected with the last switch on the next workday. Sometime after the 2017 Spring Meet, more track in this yard will be replaced as time and weather permits.