Progress continues on getting the new storage building ready for use. When the club received the building, there was no electrical outlets and the light fixtures needed some attention. Once the fixtures were re-wired, new LED bulbs were installed. The new bulbs provide a lot of illumination and make it easy to see everything in the building. An exterior light was also installed to help light up the area during the meets.

The other project of the day was installing some lights on both ends of the caboose. Last summer, new flood lights were installed on top of the caboose to illuminate the loading / unloading area. These lights work really well but don’t reach the ends of the caboose. There have been a few instances where members can’t see the stairs if it is dark. There should help correct that issue and make the caboose even more impressive at night.