February 24th Workday
/This was a spur of the moment workday that got a lot of things done. In preparation for the new unloading area, two yard tracks had to be moved over about 2 feet.
After the tracks were moved, we used the tractor to ballast, straighten and level the tracks. Since this went so fast and more members showed up, we decided to repair and re-ballast the entire shop yard.