March 21st Workday
/Chuck Norman has been working on the bridge between the bathroom curve and the tunnel. The bridge decking was in bad shape and in need of replacement. Chuck, over several days, removed the old decking, painted new boards, installed the decking, and gave the bridge a fresh coat of paint.